Water and Power Infastructure
Power and water are already located at the site

Infrastructure

Water license & supply system in place.

As a former mine site, there is already significant infrastructure in place that supported a 25,000 TPD open pit operation.  The property has a water license which is ample to support an operation in the 25,000 to 50,000 TPD range.  In addition, there is a 138 kv power line in place servicing the existing facilities at site.

A new milling facility would be required to be built on the copper mountain side of the property to consolidate the operation facilities close to the mining area.